Today we continued the work on the IPATSiA setup (#67057).
We arrived around 18.15 LT at WE. At 18.30h LT we switched on the chiller and the laser and waited a bit for thermalization. The power was oscillating a bit between 30 mW and 45 mW.
Here a chronological list of the events (see Fig. 1):
At 19:42 LT the ITF locked in LN2:
- 19:45:15 -> START SHINING
- 20:06:30 -> STOP SHINING (Fig. 1 red bars)
At 20:17 we changed the position of the point absorber. The power was stabilized at 28 mW.
- 20:39 -> START SHINING
- 21:00 -> STOP SHINING (Fig. 1 orange bars)
At 21:02 the ITF unlocked and we changed again the position of the PA. At 21:50 the ITF relocked in LN3.
- 21:51:15 -> START SHINING
- 22:09:30 -> STOP SHINING (Fig. 1 yellow bars)
At 22:15h we raised a little the emitted power of the CO2 laser to 41mW.
- 22:25:30 -> START SHINING
- 22:51:15 -> STOP SHINING (Fig. 1 green bars)
At 22:55h we swicthed off the CO2 laser and then the chiller at 22:57h. The power setting has been left to 41 mW (not the minimum).