Today we performed additional NF injections with the small coil.
At WE the small coil was positioned at the 2nd stage of the platform, approximately close to the F7, we performed one sweep 8-330 Hz, 5V, 300s, all three orientations
At SDB1 we performed sweep injections 8-1000 Hz, 5V, 300 in four locations:
- tower base, S-W corner
- platform level, S-W corner
- tower base E-N corner (same location as the injectio performed in May)
- tower base N-W corner
Finally we brought the setup in EEroom, and positioned the coil at SIB1, W-S corner (ready for the next shift)
The log file with all the details of gps and actions is attached.