Below the list of the activities carried out during this shift:
- standard maintenance activities for vacuum and cleaning operation;
- grass cutting;
- DAQ
- SVS - alignment recovery on squeezer box (de Laurentis)
- test on PDUServer
At around 10:30 UTC all the maintenance activitied were concluded.
At around 10:46 UTC the NI suspensions started to oscillate for unknown reason; at 11:26 UTC I opened all the loops and I contacted Paolo who started to investigate the problem. He discovered a similar problem to NI ACC1 gain changed; he was able to close the loops but a deeper investigation will be needed.
At 13:05 ITF in NI single bounce to allow DET people to tune the OMC phases.
SUSP
IB FO COIL H1 and H3 reset by Paolo.
DET
at 8:11 UTC I performed the scan of the OMC; before I had a problem with the DET_MAIN node ( 60282 ).
OSD
Calibrations: 6:10 UTC CITF; 6:36 UTC NI single bounce; 7:01 UTC WI single bounce.
SBE
- SIB2 opened by the guardian; vertical position recovered and loop closed at 7:28 UTC.
- the EIB act0 - Actuator driver is out of optimal range; experts informed by mail.