SQZ DAQ boxes
The "SQB2_DBOX_SBE", "SQB2_DBOX_LC" and the "EQB2_DBOX_03" Daq boxes were re-configured to recover the correct timing error value .
Operations perforned between 2023-05-23-07h19m03-UTC and 2023-05-23-07h24m23-UTC
After these operations the SQB2 LC and SBE loops were successfully closed
Data Collection
In order to have the QPD monitoring channels available for the Detector Monitoring servers , the data collected by the QPDmoni server are now merged on the data flow at the FbmAlp level instead of the FbmSt level previously .
Operations performed between 2023-05-23-09h45m40-UTC and 2023-05-23-09h50m23-UTC . During this period some data are missing