The interferometer being locked in acceptable conditions (Hrec_range_BNS around 6.5Mpc, Fmoder not yet optimal but slowly improving) at 17:10 LT we launched the script that performs magnetic injections in CEB. The coil setup is the one described in 37710 with the exception that the coil axis is now pointing upwards.
The script will inject 21 lines equally spaced btw 14.67Hz and 285.47Hz and the start over again for a total of 5 times. It is expected to end on Sunday morning around 7:50 LT.
Figure 1 shows a shot of the injected line at 68Hz, it is well visible in DARM.
------------------------------------------------------
/data/procdata/detchar/env/Alessio/Misure_Virgo/Mag_Injections/Scripts>MagInj_sweep.py
DAC channel (i.e. NOISE_CEB_DAQroom, EEroom, DetEER, NOISE_WEB,NEB): NOISE_CEB_DAQroom
Log file name (to be read by Matlab code): MagInj_CEB_V_2017_07_01.log
Start frequency (Hz): 14.67
Stop frequency (Hz): 285.47
Number of points (integer): 21
Duration time below 100 Hz (seconds): 300
Duration time above 100 Hz (seconds): 600
Please enter measurement amplitude envelope in freq/amp pairs (a single amplitude is accepted)
For example (3 envelope points): 1 5e-1 10 5e-2 100 2e-2
Measurement amplitude envelope in freq/amp pairs: 0.5
Please enter the total number of cycles
Number of cycles: 5