Hall probe at x = -2m, y=0, z=0 (in mirror ref. system)
Hall probe channel names:
Pr_SE_DetBrew2 = horizontal, along mirror X
Pr_SE_DetRack = horizontal, along mirror Z
Pr_SE_WallCE = vertical
Hall probe calibration: 1V/Gauss
1) coil axis along X
>>> check linearity:
inject 11Hz line with three different values of Voltage to the coil:
freq[Hz], voltage[Vrms], current[dBVr], GPS
11, 30, -30.7, 887098575
11, 10, -27.7, 887098859
11, 3, -21.7, 887098859
3) coil axis along Y (30Vrms to the coil)
5, 887102403
11, 887102511
15, 887102608
21, 887102723
33, 887102823
44, 887102906
57, 887103010
69, 887103111
87, 887103204
103, 887103324
(163, 887103409, 45s)
132, 887103476
171, 887103553
203, 887103656 to 887103783
>>> beam translation experiments: Oo_B5_q1x, Oo_B5_q1y
15Hz line
1) coil axis along Y
ramps +3mm -> -6mm -> 0
ramp x from 887104441 to 887105965
ramp y from 887106155 to 887107070 (10:36:45 UTC)
2) coil axis along Z
smaller excursion to save time
ramps +2mm -> -4mm -> 0
ramp x from 10:39:30 UTC to 887107707 (10:48 UTC)
ramp y from 10:51:00 UTC to 10:57:30 UTC
3) 887108357 coil along X
ramps +2mm -> -4mm -> 0
ramp x from 11:00 UTC to 11:07 UTC
ramp y from ... to 11:25:30 UTC
Injections at NE mirror:
==================
Hall probe at: x = -2m, y=0, z=0 (in mirror ref. system)
Pr_B7_d2_ACq = along X
Pr_B7_d2_ACp = along beam (Z)
Pr_B7_d1_ACq = vertical (Y)