Reports 1-1 of 1 Clear search Modify search
Injection system (General activities)
derossi, gosselin, genin, masserot - 9:19 Monday 03 December 2018 (43858) Print this report
switching off of the electronics in EEroom

In order to let M. D'andrea to work in EEroom, this morning we blocked the beam at the output of the ML fiber and in the EERoom we switched of the SL, the laser amplifier, the BPC crate, the laser chillers, the phase camera's electronics,  the EIB SAS's electronics and the rtpc2 servers.

Comments to this report:
fiori, paoletti - 15:44 Thursday 20 December 2018 (44154) Print this report

During the switch off of electronic equipment in EE-room (December 3rd) we see disappearing some sideband noise around 100Hz (Figure 1) and 200Hz (Figure 2) in CEB UPS, as well as in CEB magnetometers and Electric probe (that was measuring the voltage noise between EE-room electrical equipement ground  and Virgo ground (Figure 3). In particular these are the inner sidebands peaking at 98.9 Hz  and 101.1 Hz. Possibly this is associated to the switch off of thechiller cooling the beam dumps (but to be verified).

Images attached to this comment
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×