This evening, we resumed the magnetic line injection (elog #62843). Due to some issues with the Automatic Injection code, we used the ENVnoise process from the VPM interface instead.
We tuned the amplitude of the lines, starting with the WE building.
All the lines are injected simultaneously. The frequencies and amplitudes (sent to DAC) are reported in the table below.
| Frequency (Hz) | Amplitude (V) |
| 2.5 | 0.4 |
| 3.6 | 0.32 |
| 4.6 | 0.32 |
| 5.7 | 0.36 |
| 6.7 | 0.36 |
| 7.4 | 0.36 |
| 8.9 | 0.4 |
| 10.5 | 0.22 |
| 11.9 | 0.28 |
| 13.5 | 0.34 |
| 15.3 | 0.38 |
| 17.5 | 0.4 |
| 19.1 | 0.48 |
| 22.5 | 0.54 |
| 24.5 | 0.58 |
During the tuning, the interferometer unlocked and the auto-relock process got stuck. We contacted Diego, who fixed the problem.
*** We left the WEB magnetic line injection running for the entire night, and tomorrow morning the injection will be stopped manually. ***