Reports 1-1 of 1 Clear search Modify search
AdV-ISC (Alignment control scheme conceptual design)
mwas, ruggi, bersanetti - 20:43 Wednesday 15 January 2025 (65985) Print this report
Comment to Exploration of alignment offsets vs carrier and optical gain (65944)

Today we have continued the investigation of NE/WE and PR offsets. First a 2mm common offset on NE/WE, then PR moved by 100um, then the NE/WE common offset increased to 3mm, then the PR offset removed, and finally the NE/WE common offset removed. The interferometer unlocked during that last step.

Figure 1. In this case the PR offset reduced the B2 power only by a small amount, and increased significanly the B2 power fluctuations at low frequency (much below 1Hz). The PR offset may have reduced the B1s power by a few percent. The increase in carrier gain and DARM gain from the NE/WE common offset was clearly present again.

Images attached to this comment
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×