Following what done for WE, this morning we unplugged the F7 stepper motors of all suspension optics and benches. In particular: NI, WI, PR, BS, SR, INJ, DET and NE (the NE one was done during the ENV shift of last night, but we could not notice any appreciable improvement in hrec).
Any possible effect is to be checked in the next lock (possibly expected around 50Hz where some little structure remains)
We also have labelled each single power cable to be able to plug them back to the right smart-plug slot when needed.