Reports 1-1 of 1 Clear search Modify search
AdV-INF (Virgo Reference System Geometry)
a.paoli, c.fabozzi, l.paoli - 16:54 Friday 11 September 2020 (49403) Print this report
FDS alignment - Checking of the tube support positions

This week we completed the survey engineering activity for the tracking of the VRS position of the FDS vacuum components on the floor, in the Central Building, the North Gallery and the initial part of the North Tunnel (tube supports for the link between the SQB1-SQB2 minitowers and the link between SQB2 and the FC-IM microtower). Fig.1 to 10 show the final result of the survey engineering activity. We also traced the position of the SQB2 center and the reference cross for the next installation and alignment (Fig.5 and 6).

Tab.1 reports the final result in VRS, with the nominal and the surveyed coordinates.

Images attached to this report
Non-image files attached to this report
Comments to this report:
a.paoli - 15:26 Tuesday 15 September 2020 (49424) Print this report

The correct title of theĀ  entry is "Tracking of the position of SQB2 minitower and of the supports of SQB1-SQB2 and SQB2-FC-IM links"

Search Help
×

Warning

×