Today afternoon from 16.30 LT to 17.30 LT I installed a shutter along the HWS-DET path on EDB (see pictures in attachment).
The cabling has also been completed and the shutter positioning can be controlled thorugh VPM interface (CH 1):
UP: the beam propagates up to the NI mirror
DOWN: the beam is damped on the bench
I left the shutter UP.