Reports 1-1 of 1 Clear search Modify search
AdV-VAC (Vacuum equipment)
Fiori, Vacuum - 18:15 Thursday 20 July 2017 (38722) Print this report
Switch OFF test
Here we give the times of the today switch off test, in sequence: 
 
11:45LT _ stop of turbo's cooling fans of: PR ; BS ; PR-BS (these are the near ones to PR tower: on PR turbp, on BS turbo, on PR-BS link turbo,  respectively)
12:45LT _ stop of the HVAC cooling fan of the 'remote pump' room
13:30LT _ stop of all the remaining active cooling fans of CEB turbos: IB; DT;SR;NI;WI (both types, industrial ones and 'home' type ones)
13:30LT _ restart of the HVAC cooling fan of the  'remote pump' room
16:30LT _ restart of all the turbo fans previously switched OFF.
 
Remark: since the PR; BS; PR-BS fans are likely affecting the ITF signals (forthcoming analysis), we have applied there a first seismic insulation support during
 the restart operation itself (rubber feet + heavy supporting slab). To be improved during the next maintenance break.
Search Help
×

Warning

×