Reports 1-1 of 1 Clear search Modify search
AdV-ISC (Alignment control scheme conceptual design)
mantovani, pinto - 16:51 Friday 09 October 2026 (69889) Print this report
SR alignment phases and DCP calibration

This morning we have finished to retune the phases for SR alignment

CARM null

SR tx ; error signal ASC_SR_TX_DCP_HF_B1p_I; measurement UTC 9 Oct 7:27 - 7:41 ; initial phase -0.31; new phase 0; Figure 1 

SR ty : error signal ASC_SR_TY_DCP_HF_B1p_I; measurement UTC 9 Oct 7:41 - 8:10 ; initial phase -1.47; new phase -1.2; Figure 2 

LN 2

SRtx : error signal ASC_SR_TX_DCP_HF_phi_B1_I; measurement UTC 8 Oct 8:42- 8:51 ; initial phase 2.2; new phase 3.8; Figure 3

SRty : error signal ASC_SR_TY_DCP_HF_phi_B1_I; measurement UTC 8 Oct 8:25- 8:41 ; initial phase -1.47; new phase -1.6; Figure 4

the phases have not been implemented yet

DCP calibration

the DCP calibration hase been done by injecting DARM broadband noise (ampl 20) and fitted by manuel for different alignment of SR

8:54:25 UTC (120sec ) DCP online = 375Hz DCP fitted = 345Hz

9:15:55 UTC (120sec) DCP online = 290Hz DCP fitted = 260Hz

9:31:55 UTC (120sec) DCP online = 200Hz DCP fitted = 178Hz

 

Images attached to this report
Comments to this report:
boldrini - 19:18 Friday 09 October 2026 (69892) Print this report

The final phases for the SR alignment are:

  • CARM_NULL_1F:
    • sr_tx_b1p_dcp_phi0 = 0
    • sr_ty_b1p_dcp_phi0 = -1.09
  • LN1:
    • sr_tx_dcp_hf_phi_b1_phi0 = 4.9
    • sr_ty_dcp_hf_phi_b1_phi0 = 1.97
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×