Reports 1-1 of 1 Clear search Modify search
AdV-PAY (CP Support for NI and WI Monolithic Payloads)
Eugenio Benedetti, Ettore Majorana, Manuel Pinto, Marco Ricci - 9:45 Tuesday 14 July 2026 (69343) Print this report
Payload assembly: WI payload full assembly, NI payload CP assembly
Full assembly of both CP (NI and WI). Full assembly of the WI payload
Images attached to this report
Comments to this report:
Gherardini, Zaza - 10:53 Tuesday 14 July 2026 (69348) Print this report
This morning we checked the electrical continuity and insulation towards the metallic frame for the following cables: S1 and S2 (marionette coils); U1 (Ring Heater); U2 (Ring Heater motors); U3 (mirror coils for sensing and PT100 on marionette coil); V1 (mirror coils); V2 and V3 (marionette motors); Z2 (temperature probes on mirror coils and on ring heater).

We found one broken connection on the U2 cable: problem fixed.
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×