LB-EIB pointing loop (BPL) commissioning

As a first step towards the commissioning of the BPL this afternoon we installed a mirror before the EOMs on EIB to send the main beam on a divergent lens (-30mm and then a beam dump), so that we will be safe while doing tests on the PZT (the risk would have been to burn something since the power density at the level of the EOMs is high).

We added 2 mirrors, 1 lens, 1 beam dump, and removed 1 iris, for a weight of about +1kg. We rebalanced the EIB and left it suspended. The PMC is scanning and the mirror at its output is flipped.

Tomorrow we will plug the PZT to the DACs and start the commissioning of the QPDs.

 

Images attached to this report
Comments to this report:
derossi, gosselin, lagabbe, pinto, spinicelli - 18:20 Thursday 07 May 2026 (69090) Print this report
  • This morning, before starting to work on the BPL loop, we unblocked the beam transmitted from the PMC and we took the references of its position on the BPL QPDs (see fig 1).
  • Then we plugged the PZT to the DAC in Eeroom. The PZT driver accepts -2V +12V, while the DAC dynamics is +-10V but due to the LEMO 3 PIN - BNC adaptation it is restricted to +-5V. On the PZT driver the DAC input is summed with a offset (from 0 to 10 V) that can be manually adjusted, and then amplified by slightly more than a factor 10, to -30 +130 V.  We manually set the offset to mid range (5V), so that we can correct around this value with the DAC.

lines 127-130 in  /virgoData/VirgoOnline/ISYS_EER_dac.cfg

ACL_DAC_CH    dac1955_EER_DAC2_ch03    1    DAC1955_FREQ    BPL_PZT_EIB_M1BH_CORR            0            1            "None"                        "ad1955-10v"    ""
ACL_DAC_CH    dac1955_EER_DAC2_ch04    1    DAC1955_FREQ    BPL_PZT_EIB_M1BV_CORR               0            1            "None"                        "ad1955-10v"    ""
ACL_DAC_CH    dac1955_EER_DAC2_ch05    1    DAC1955_FREQ    BPL_PZT_LB_M14H_CORR            0            1            "None"                        "ad1955-10v"    ""
ACL_DAC_CH    dac1955_EER_DAC2_ch06    1    DAC1955_FREQ    BPL_PZT_LB_M14V_CORR            0            1            "None"                        "ad1955-10v"

  • We injected a 2Hz line on the PZTs during 90s. Here the gps for each actuator

gps = [1462194492 1462194603 1462194722 1462194871]; actuators = {'INJ_BPL_PZT_EIB_M1BH_CORR','INJ_BPL_PZT_EIB_M1BV_CORR', 'INJ_BPL_PZT_LB_M14H_CORR', 'INJ_BPL_PZT_LB_M14V_CORR'};

  • The sensors are: {'INJ_BPL_QF_h_norm', 'INJ_BPL_QF_v_norm','INJ_BPL_QN_h_norm', 'INJ_BPL_QN_v_norm' };
    • QF mainly see the tilt (done with EIB M1B and also a bit with LB M14)
    • QN mainly see the shift (done with LB M14)
  • We computed the driving matrix with the attached script and closed the loop. We started to try different filters (see 2nd plot). As a final test we removed the resistences at the output of the PZT driver, from around 15:58 UTC to 16:20 UTC (but there is a lot of noise on the signals, introduced by the amplifier itself, so we put it back).

To do next:

  • to perform noise injections and design a better filter which does not introduce noise on QF h between 20 and 100 Hz
  • check availability for a DAC +-20V
  • add in the ISYS_BPL code:
    • a latch to keep the setpoint when the loop is open 
    • clip on the corrections to avoid too large beam excursion
    • trigger to open the loop if there is no signal

 

 

Images attached to this comment
Non-image files attached to this comment
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×