This afternoon we could start the work on ALS.
- We switched off all the ALS is in the Laser Lab atrium (taking notes for the cabliing):
1064 pd alim L.2.4 DCF 21 (lemo adc 3 orange)
534 pd alim L3.1 DCF 21 (lemo adc 6 blue)
West beating RF PD alim L3.2 DCF 21 (sma cable 2 atr-piscina 15m lemo adc 5 green) fiber EIB atrium B 14m
North beating RF PD alim L3.3 DCF 21 (sma cable 1 atr-piscina 15m lemo adc 4 yellow) fiber EIB atrium A 14m
Box ALS Ctrl PD alim 1 L2.2 DCF21 (lemo adc 1 brown)
Box ALS Ctrl flip mirror alim 1 L2.3 DCF21
- Installation of some of the optics on the EIB.
- We removed extra weight from the EIB (3 flip mirrors from IBMS, for a total weight of 1.55 kg).
- Since we do not have the main beam pickoff available yet, we installed a fibered laser at 1064 nm for alignment and we started to install some optics.
- The goal is to move the setup from the SHG box (pict 1 and 2) on the EIB (we cannot simply move the whole 40cmx50cm bench because its own weight is more than 20kg. Moreover the height of the beam in the box is 7.5 cm while on the EIB is 10 cm)
To be continued...