20/11/2025
This morning, we performed a geometrical survey of NEB NCals and swapped NEN and NWN rotors. Here below the details.
All times in UTC. Use notation as in wiki page
7:13 : Jigs placed on NE and NW platines between 7:13 and 7:14 (see position plot)
Positions of rotors before survey and changes:
-NWN : rotorbox 2021-06 (wiki table says this box contains R4-17)
-NEN : rotorbox 2022-01 (wiki table says this box contains R4-16)
~8:53 Start calibrating station 1 for measurement of East setup
~9:19:56 : NEF measure; --> fail?
remeasure calibrating points from 9:26:52 to 9:34:28
9:34:28 : NEF point
9:35:05 : NEN point ->9:35:49
9:36:34 : NET point --> 9:37: 16
9:37:50: point 210_aux (to check between stations)
9:42:33 : Start dismounting NCal NEN
9:56:17 Start calibrating station 2 for measurement of West setup
10:00:07 sphere on NWF point
10:00:38 sphere on NWN point
10:01:34-49 move sphere back to NWF
10:02:35: move sphere to NWT --> 10:03:24
measure 210-aux and put rotorbox 2022-01 on NWN
10:08:35 measure NWN_swap; 10:09:22 measure NWF_swap - 10:10:05 measure NWT_swap -->
10:16:29 rotorbox installed on rotorbox 2021-06 on WEN
~10:23:01 start calibrate station 3 for East "swap" measurement
10:25:38 NEF -> 26:13-26:21 NEN -> 26:46-27:14 NET ->27:45-28:04 210_aus 28:54
Remove jigs from East setup (10:29:39-10:30-15)
WEB_pos_sensors.png shows the position measurement of East and West setup during all the today work
11:00 unexpected LV problem for NNN observed: 32V gives 0 current.
- change it from channel 1 ncal east Power Ssupply to channel 2 ncal south Power Supply
- It did not fix the problem unfortunately
11:05 we restart all rotors (except NNN which is not spinning) at twice the nominal frequency and leave