Reports 1-1 of 1 Clear search Modify search
On-call intervention (General)
Oncall-system - 10:18 Monday 14 July 2025 (67288) Print this report
On-call intervention

The following report has been submitted to the On-call interface.

On-call events -> Interferometer Sensing & Control

Title: CH tuning

Author(s): casanueva, cifaldi

Called at: 12:45, 13-07-2025, by: None
Remote intervention: Started: 12:45, 13-07-2025; Ended: 14:30, 13-07-2025
On-site intervention: Started: ; Ended:
Status: Resolved
Operator when issue resolved: Montanari

Details:

Since the situation of the interferometer was so unstable, we decided together with Michal to make a step of the CH already on Sunday. Based on past experience we made a 10% common decrease of the CH. We waited for 1 hour and we tried to relock. The lock acquisition was succesful at the second attempt. FIgure 1 shows the evolution of the DIFFp TY gain, which is significantly better than in the morning.

Also FIgure 2 shows the evolution of the sidebands in the CITF during the CH transient. There is not a significant variation, which is encouraging.

* Note that any files attached to this report are available in the On-call interface.

Comments to this report:
casanueva - 10:19 Monday 14 July 2025 (67289) Print this report

Here I attach the two plots that I refer to in the entry.

Images attached to this comment
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×