AdV-DET (Commissioning)
gouaty, mwas, bersanetti - 16:36 Tuesday 04 March 2025 (66300) Print this report
DET_MAIN stalled

This afternoon the DET_MAIN node got stalled in SHUTTER_CHECK_CLOSED.

We suspect that the cause of the problem was a change in the electronic offset on the B1_PD3 photodiode (correlated with the detectiion lab humidity control test performed during the maintenance).

We adjusted the B1_PD3 offset by +0.0002 mW at 15h22 utc. Then after, performing a successful SHUTTER_CHECK_OPEN (since the shutter was actually opened), we performed a SHUTTER_CHECK_CLOSED to restore the standard conditions of DET_MAIN.

Comments to this report:
mwas - 15:42 Wednesday 05 March 2025 (66301) Print this report

Figure 1 . Looking at the offset during the relock today the offset is well adjust with the power at zero when there is no power on the B1 PD3.

Images attached to this comment