Today
- the LNFS_Demod server has been restarted
- to provide the LNFS_{6,8,56}MHz_raw_phi channels bwteeen +/-4PI instead of +/-PI previously
- operation performed at 2025-03-04-08h21m31-UTC
- As expected, the phases between the LNFS and the EOM do not change (see plot)
- the SIB2_Photodiodes server has been restarted
- to propagate the SIB2_B2_PD2_50MHz_phi for the SIB2_Quadrants demodulation phase noise mitigation
- to add for monitoring purposes, the SIB2_B2_PD2_{6,56}MHz_raw_dFreq channels
- operartion performed at 2025-03-04-08h39m44-UTC
- the SIB2_Quadrants server has been updated
- to use the SIB2_B2_PD2_50MHz_phi for the demodulation phase noise mitigation instead of the SIB2_B2_PD2_112MHz_phi previously
- operation performed at 2025-03-04-08h40m11-UTC
It remains to check the lock of the ITF and if the noise for the ASC_PR_T{X,Y} channels based on B2_QDx_6MHz_{H,V}_I is at the same level