AdV-ALS (End arm injection)
derossi, casanueva - 21:06 Tuesday 11 February 2025 (66177) Print this report
general checks on ALS

This morning we optimized the injection of the pickoff on the laser bench (fig. 1). However, the power at WEB was not recovered and we were still not able to close the PSTAB loop.

General checks:

check on   NEB WEB  
ALS NEB/WEB PD IR PSTAB CALI 18:01 UTC PSTAB open at NEB 2.3mW 1.3mW

fiber connections to be checked (next maintenance)

at WEB we do not have power enough to close the PSTAB -->

 

GREEN power   38 mW 39mW  
ALS WEB/NEB PD GREEN I/Q

err signal demod phase WEB/NEB_ALS_fast.phi0

4.7 4.7-->4.9  
VCO offset vco ramp set 0.0 0.25--> 0  
check of the triggers they were ok      
check of the lock threshold in the past week sometimes metatron did not realize that the green was not locked (the lock threshold should be the same value as the trigger high) 0.5-->0.45 0.55-->0.45  

Measurement of the OLTF: white noise 1, colored noise 1, select colored noise 1. WEB_fast.noise_sensing_noise_rtpc.noise=1e-8

The UGF were both 1kHz. We increased the gains by 1,5 times for the west (als gain 0.35--> 0.55 -fig.2- ) and 2 for the north (0.45-->0.9), in order to increase the UGF

Check of the modulation at 70kHz 

NEB and WEB look very similar. In fig.3 pink is with the new gains 0.55 at web and 0.9 at neb, and in blue is with 0.55 at web and 0.45 at neb (preivous gain), to check if with the new gains we do not have strange behaviours.

In conclusion, the two green at the end were fine in terms of alignment, demodulation phases, thresholds, amplitude of modulation. The only thing that we've changed and that in the past could have caused some problems was the lock threshold, which was slightly too high and could make metatron believe that the green was still locked while it wasn't.

We wanted to run the automatic alignment on the EIB since the values of the beatings are too low, but we did not manage to move the piezo.

 

To be still checked during next maintenance: 

- the power at web (now the soa is working close to its max and it is still not sufficient to close the PSTAB. Fiber connections must be checked)

- check with Alain why the alignment on EIB did not work

We left the ITF locking in LN3.

Images attached to this report
Comments to this report:
derossi, masserot, casanueva - 14:25 Tuesday 18 February 2025 (66208) Print this report

In the shift of last week we did not manage to run the automatic alignment on EIB since we forgot to push the "release" button (to remind that it keeps memory of the last value of tension on the piezo). The instructions are available here.

Alain made a modification in the VPM and we are now able to manually choose an offset to apply to the piezo (set X/Y memory).

We ran the usual "snail" (fig. 1). It could be worth to do it on a weekly basis during the maintenance.