A few minor changes on the NCal configuration of the SNEB_dbox_rack and NEB_NCal processes have been made this morning during the maintenance:
- The NCal_*_rotor_raw_FS channels have been renamed to NCal_*_rotor_raw_DS to keep them in the raw data for 50 seconds every 10k seconds.
- The thresholds on the LED signal amplitude are now recorded as SMS signals
- These thresholds have been adjusted on NSN following the observed power reduction of the last days.