Reports 1-1 of 1 Clear search Modify search
AdV-DAQ (Calibration)
aubin, masserot, mours, vanhove - 12:38 Tuesday 26 November 2024 (65622) Print this report
NCal maintenance

A few minor changes on the NCal configuration of the SNEB_dbox_rack and NEB_NCal processes have been made this morning during the maintenance:

  • The NCal_*_rotor_raw_FS channels have been renamed to NCal_*_rotor_raw_DS to keep them in the raw data for 50 seconds every 10k seconds.
  • The thresholds on the LED signal amplitude are now recorded as SMS signals
  • These thresholds have been adjusted on NSN following the observed power reduction of the last days.
Comments to this report:
vanhove - 13:16 Friday 29 November 2024 (65660) Print this report
After the NSN LED replacement, its signal was stable for about 1 day but then started to decrease. To adapt for this decrease, the thresholds used to analyse the corresponding signal are decreased to 0.025, 0.05 and 0.090.
vanhove - 11:23 Sunday 01 December 2024 (65673) Print this report
Change of NSN threshold to adapt for LED light decrease: phaseChThr now = 0.087
vanhove - 15:51 Friday 06 December 2024 (65736) Print this report
New Change of NSN threshold to adapt for LED light decrease: phaseChThr now = 0.080
vanhove - 10:35 Sunday 22 December 2024 (65856) Print this report
New Change of NSN threshold to adapt for LED light which is now increasing: phaseChThr now = 0.083
vanhove - 10:03 Wednesday 25 December 2024 (65870) Print this report
New Change of NSN threshold to adapt for LED light which is now increasing: phaseChThr now = 0.088 (at 8:21 UTC)
vanhove - 20:44 Saturday 28 December 2024 (65882) Print this report
New Change of NSN threshold to adapt for LED light which is now increasing: phaseChThr now = 0.092 (at 19:42 UTC)
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×