I was call for a problem on green production for north arm.
While investigating, i noticed that at some point between 16:00 and 22:00 UTC the 12th of November, something happened which decreased the beating DC level for both arms.
We realigned the beatings inside CEB using the VPM, recovering enough signal to allow ALS to operate and succesfully passed ALS stage and locked at around 15:30.
The green production problem for north arm is still present and is currently under investigation.