Reports 1-1 of 1 Clear search Modify search
Virgo Runs (O4b)
amagazzu - 15:31 Tuesday 12 November 2024 (65514) Print this report
Operator Report - Morning shift

ITF found in relocking and in PREPARE_SCIENCE Mode. It was not possible to relock due to the ITF unlocking at various steps of the locking acquisitions.
At 7:00 UTC I set the ITF in MAINTENANCE Mode and manually unlocked. Here a list of the activity reported to the Control Room:

- Cleaning of Scientifc Area (External firm managed by Ciardelli);
- OMC Scan/Lock (Operator);
- At 7:20 UTC, TCS Chiller Refill (Ciardelli);
- Cranes Inspection (Bazzi);
- At 8:05 UTC, Check of IMC Working Point and Position (Operator);
- TCS power adjustment (Nardecchia);
- From 8:20 UTC to 9:00 UTC, TCS Camera reference and Power checks (Operator);
- From 9:30 UTC to 11:10 UTC, INJ activity inside Laser LAb / EE Room (Spinicelli, Montanari, Melo, De Rossi);
- ACS check on DET Humidifer (external firm managed by Soldani);
- At 10:00 UTC, Final check performed by Nenci. 

At 11:10 UTC, after the INJ activity was concluded, I started the relock. 
In agreement with the expert, at 13:42 UTC we put the ITF in TROUBLESHOOTING and DOWN State to allow Montanari to go back to the NE to disconnect the accelerometers of the Suspension to revert the action performed yesterday.
ITF left unlocked.

DET
7:20 UTC - 5 minutes of OMC Lock in NI Single Bounce configuration
From 7:27 UTC to 7:47 UTC - OMC Scan

TCS Power Checks

    CH [W] INNER DAS [W] OUTER DAS [W]
W on the pickoff  0.28 0.05 0.258
N on the pickoff  0.646 0.047 0.602
Images attached to this report
Comments to this report:
Montanari, Dattilo, Baldocchi - 18:01 Tuesday 12 November 2024 (65518) Print this report

This morning, the inspection and increase of rodent traps were also carried out inside the experimental buildings.

The personnel of an external company, under the supervision of N. Baldocchi, increased the number of rodent traps installed in terminal buildings to mitigate the damage caused by them.
As part of the same intervention, an inspection was conducted in the central building to review traps installed in previous operations. During the inspection, any damaged devices were replaced.

The monitoring and implementation of the traps is ongoing, to ensure the effectiveness of the measures adopted and, if necessary, to plan additional actions.

Search Help
×

Warning

×