This morning, the gain of the OMC Peltier loop has been restored to its standard value in vacuum (50) and the OMC temperature control has been re-engaged at 7h43 utc.
We restore the SDB1 angular setpoints used in vacuum and close the SDB1 angular control loops at 7h51 utc.
Since the correction in TZ is quite high (6V) we act on the motorized counter weight to reduce it:
TZ: 9*-2000 = -18000 steps
TX: 5*-2000 = -10000 steps
We note that the correction in TY is -3.4 V, while it was around -1V before the vacuum break. Thus the TY torque has changed.
SDB2 position loops closed at 8h08 utc.