Few weeks ago we started to receive some alerts from the DMS warning us that the reflection of the slave was decreasing (to be noted that the reflection is actually the beam seeding the neovan).It might be coming from a slight misalignment inside the cavity.
We took a better look at the trend of this power since the installation of this SL (beginning of 2023), the plot is attached. There was a first period till december 2023 in which it did a vary a lot and eventually decreased. It seems that it stopped and became stable when we sapped the PID controller of the temperature of the crystal 2.
So, recently it started to decrease again. Nothing worrying for now (plot 2) but we keep an eye on it. It is not critical since we do have some margin with the power we send towards the ITF but if it would ever become a problem it may require an intervention to realign the beam inside the cavity.
We will keep on monitoring the situation. .