The controller of the down condition for NI etalon has been modified (decreased the gain of a facto 100 and increased the pole frequency of a factor 10).
Morevoer the reset of the down offset will be done in 600 sec (to be adjusted).
Francesco will reload the controller as soon the present activity will end.