This morning I found the ITF locked in LOW_NOISE_3, from 7:04UTC to 13:35UTC I set the commissioning mode for magnetic line injection at NE and WE; the ITF unlocked at 13:42UTC just after the daily calibration because of something wrong in the BS IP control (see plots), ITF relocked at the first attempt.
Sub-system reportsCalibration
- 13:36UTC: CALIBRATING_DF_DAILY;
DET
-7:03UTC close B2 QD2 galvo loop.
ISC
etalon scan:
- 14:40UTC: NI set from 19:914 to 19:964 (20h ramp time).