The original shift on the DAS tuning has been replaced by an HWS-INJ measurement of the curvature induced by PR CHRoCC because of its strange behavior observed since yesterday (entry 58434).
After some tests performed on the hardware side (58438), the CHRoCC has been switched OFF at 17.30 UTC.
We waited ~4 hrs for the POP cooling down and, at 21.23 UTC, the HWS INJ acquisition started in WI single bounce configuration.
At 21.33 UTC, the PR CHRoCC has been switched ON by applying 0.7 V in order to have a direct comparison with the measurements performed in the past (56588).
The measurement will go on for the night.