After the ISC shift (Entry 56318), at 20.52 UTC the NI-CH was switched off in order to cool down the CP.
At 22.19 UTC HWS-DET acquisition started and at 22.27 UTC NI-RH was switched ON.
After the ISC shift (Entry 56318), at 20.52 UTC the NI-CH was switched off in order to cool down the CP.
At 22.19 UTC HWS-DET acquisition started and at 22.27 UTC NI-RH was switched ON.