Yesterday we installed the ML spare on a breadboard and we coupled the beam into a fiber (picture 1). Coupling is 83% (measurements realized with input power from 200mW up to 500 mW), with a pump current of 2.06 A.
Today we moved the breadboard in the atrium (picture 2).