Reports 1-1 of 1 Clear search Modify search
AdV-SVS (Design/Construction)
garaventa, di pace, sequino - 11:29 Saturday 05 December 2020 (50137) Print this report
Faraday isolator installation on ESQB1
Yesterday, we installed and aligned the Faraday Isolator on ESQB1.

Photo attached.
Images attached to this report
Comments to this report:
sorrentino - 0:44 Friday 08 January 2021 (50387) Print this report

Today I optimized the BAB power in transmission of the Faraday isolator by tuning both the rotation of the motorized half-waveplate and the horizontal position of the FI mount.

First I removed the Faraday isolator and I measured the optical power at the position just before the MM telescope to be 1.399+-0.003 mW. Then I placed the FI back in position, and performed the tuning with the power meter in the same position. I obtained a maximum transmitted power of 1.392+-0.003 mW.

This corresponds to a throughput loss of (0.5+-0.3)% in agreement with preliminary characterisation in optics lab.

Search Help
×

Warning

×