Reports 1-1 of 1 Clear search Modify search
AdV-INF (Virgo Reference System Geometry)
a.paoli - 21:10 Saturday 17 October 2020 (49680) Print this report
ESQB1 alignment

Yesterday the pre-alignment of ESQB1 optical bench has been carried out.

Fig.1 to 5 show the position of the laser tracker, placed in the SAS, and the targets installed on the bench corners as references (on a special tool h= 50 mm, further the SMR offset = 25 mm). Fig. 6 shows a plan view sketch of the bench with the position of the markers surveyed.

Tab.1 reports the result of the survey and the differences wrt the nominal positions.

 

Images attached to this report
Non-image files attached to this report
Search Help
×

Warning

×