Reports 1-1 of 1 Clear search Modify search
AdV-INF (Virgo Reference System Geometry)
a.paoli, l.paoli, c.fabozzi - 19:01 Thursday 09 July 2020 (49063) Print this report
Tracking of SQB1 position and other auxiliary points in DET Lab

Today we tracked the position of the SQB1 microtower (11.3000, 3.3100) on the floor of DET Lab (Fig. 1 and 2) and the other auxiliary points neded for the next installation of the clean air structure (Fig. 3, 4 and 5).

Images attached to this report
Comments to this report:
a.paoli, c.fabozzi - 18:10 Wednesday 29 July 2020 (49121) Print this report

As requested for the alignment of SQB1 microtower, today we added the X,Y reference lines tracked on the DET Lab floor (Fig.6).

Images attached to this comment
Search Help
×

Warning

×