Reports 1-1 of 1 Clear search Modify search
AdV-DAQ (Calibration)
mours - 22:20 Tuesday 24 March 2020 (48799) Print this report
NCal injections

NCal injections were performed today from 14:09 to 19:51 UTC using both NCal at their nominal location as described in VIR-0268A-20. The ITF was in regular low noise 3 mode with squeezing. The attached plot is a time frequency plots showing the scan performed. The NCal power supply was switched off at the end of the injection time.

Images attached to this report
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×