ITF found in relocking phase, after a series of failed attempts caused by the strong wind we were able to reach LOW_NOISE_3_SQZ at 15:11 UTC. Thanks to the configuration prepared by Allocca the ITF was already locked in EQ Mode; in agreement with the Run Coordinator the ITF was set in Science Mode at 15:15 UTC while in this configuration.
During this lock the SQZ disengaged two times ( 15:56 UTC, 16:05 UTC) possibly due to the bad weather, in both case it was possible to go back in Science Mode less then a minute later.
ITF unlocked at 16:18 UTC due to a Fast Unlock ( see attached plot #1 ). After some attempts we were back in LOW_NOISE_3_SQZ and EQ Mode at 16:49 UTC.
After that the wind activity was decreased we switched to Adjusting Mode from 17:50 UTC to 17:52 UTC to disable the EQ Mode, no issue encountered in this phase even with the custom configuration.
ITF left in Science Mode.
DAQ
From around 19:15 UTC the process DDS1 started to be shown as red on the VPM. It then return for few minutes back in its normal state to switch back to red soon after. I tried to stop and restart it manually but 21:12 UTC but this action did not solve the problem. Expert informed of this behavior.
SQZ
From 14:15 UTC to 14:25 UTC the DAQ Oncall ( Pacaud ) solved the Timing issue related to the Squeezer. After that I restored the standard configuration of SQZ_MAIN.ini as indicated by the pending action.
ISC
(03-03-2020 22:00 - ) At the next unlock reload ITF_LOCK to lock without EQ Mode.