On-call intervention (General)
Oncall-system - 0:28 Wednesday 02 July 2025 (67193) Print this report
On-call intervention

The following report has been submitted to the On-call interface.

On-call events -> Interferometer Sensing & Control

Title: ALS warm realignement

Author(s): gosselin

Called at: 23:15, 01-07-2025, by: Montanari
Remote intervention: Started: 23:15, 01-07-2025; Ended: 00:30, 02-07-2025
On-site intervention: Started: ; Ended:
Status: Resolved
Operator when issue resolved: Montanari

Details:

I have been called by Beatrice because there were some trouble to go through the lock acquisition. The West arm was unlocking.
I checked and see that there was some power missing on the signal WARM_BEAT_DC.
I first try to realign the beam in transmission, ie into the fiber on EIB but the improvement was very little.
I then reliagned the beam in the arm with the galvo on SWEB. I slightly changed the set points of the tilt X and tilt Y and recover a much greater signal in transmission.
The lock acquisition went through the green lock but eventually unlocked at CARM NULL 1F.

* Note that any files attached to this report are available in the On-call interface.

Comments to this report:
gosselin - 0:29 Wednesday 02 July 2025 (67194) Print this report

plot attachedĀ 

Images attached to this comment
bersanetti - 0:59 Wednesday 02 July 2025 (67195) Print this report

Afterwards, I had to change the thresholds in the automation:

lock_thr = 0.5
dc_trig_refl_hi = -0.5
dc_trig_refl_lo = -0.6