This morning during the maintenance we performed several activities:
- We recentered the quadrant BPC NF (see first figure)
- We optimized the injection into the pick off fiber for the reference of the phase camera (see second figure)
- We realigned the beam on the quadrants of the diagnostic box (see third figure)