Reports 1-1 of 1 Clear search Modify search
AdV-COM (AdV commissioning (1st part) )
Allocca, Ruggi, Carbognani - 18:47 Thursday 20 September 2018 (42746) Print this report
Summary of this morning shift

Today we continued with the ITF recovery. Most of the times, unlocks were induced by engaging the SSFS boost.

Here's the summary:

    - We've re-tuned the demodulation phases of B5_QD2_56MHz and enabled the PR loop;

    - Changed the phase of the DIFFp error signal in such a way to flip the sign and enabled DIFFp loop

    - Turned on the COMMp and BS angular loops. Before engaging this latter, Paolo twickled a bit the BS position by hand. 

The interferometer is stable in LN1. The activity is currently focused on the OMC lock.

 

Search Help
×

Warning

×