Operator Report - Shift 15/08

The shift was dedicated to the Phase Camera Alignment and signals check carried out by Schaaf and Beuzekom.
Upon arrival it was impossible to close the loop of the RFC. Under the request of the INJ Oncall I switched the LNFS from Internal to External PLL and after this change we were able to proceed with the lock.
At 7:20 UTC the ITF reached PRITF _MICH_OFFSET_0_1 and the activity on EDB started. Later the work moved on the EPRB1 in LOW_NOISE_1: in this phase the ITF was unstable and we had several unlock probably related to the human presence near the towers. At 14:25 UTC the activity was concluded and Majorana started working on the Local Controls. Activity in progress.

VPM
ITF_LOCK crashed at 6:58 UTC, properly restarted.