AdV-DET (Commissioning)
gouaty, masserot, derossi, pillant - 15:10 Tuesday 14 August 2018 (42435) Print this report
SDB1 B5 quadrants offsets checked

This morning, the offsets of the SDB1 B5 quadrants were checked and updated.

From Fig.1 one can observe:

  • before 06h39 utc the IMC is stil locked and one can observe some signal on the SDB1 B5 quadrants (B5_QD1_sum fluctuates around 11-12, and B5_QD2_sum fluctuates  around 13).
  • at about 06h39 utc the IMC is unlocked, and one can observe residual offsets on the quadrant channels.
  • at 06h42m46 utc the old offset corrections are removed from the SDB1_Quadrants config file and one can measure the total offsets by reading the B5 quadrants channels (see zoomed plots on Fig.2 for a better view).
  • at 06h53m38 utc, the configuration of the process SDB_EDB_dbox_rack is reloaded after correcting these offset values. All channels of the quadrants are then equal to 0 (as expected from the offset subtraction), including the sum channels.
  • at about 07h11 utc, the IMC is locked again. One can see that the offsets on B5_QD2 had an almost negligible impact on the sum channel. However the DR, UR, UL channels have changed by about a factor 2, compared to the situation before offset correction.

It was then possible to reengage the bench drift control without problem.

Images attached to this report