Reports 1-1 of 1 Clear search Modify search
AdV-PAY (SR Payload)
majorana, pinto - 17:17 Friday 16 October 2026 (69941) Print this report
New baffle on SR
The new baffle with reduced aperture 150 mm has been installed.
The system has been balanced, the weigh readjusted (~700 g heavier) and the controls have been crosschecked after the installation.
The system has been released to VAC group to be evacuated. Fig1,Fig2 (front baffle) , Fig3 (rear baffle)

We exit from Central buiding
Images attached to this report
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×