Reports 1-1 of 1 Clear search Modify search
AdV-DET (Commissioning)
boldrini, bersanetti, gouaty - 20:40 Tuesday 06 October 2026 (69867) Print this report
OMC alignment in DC readout

While the ITF was locked in DC readout this afternoon, we enabled the computation of the B1 DARM dither signal and engaged the B1 DARM beam drift control of SDB1 (Fig.1). This has the effect of increasing the optical gain by almost a factor 2, while the bench alignment changed by almost 10 urad in TX and by 1 or 2 urad in TY.

Accordingly after the unlock, the B5 QD2 offsets were updated (H=+40 and V=+200).

Images attached to this report
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×