Reports 1-1 of 1 Clear search Modify search
AdV-ISC (Commissioning up to first full interferometer lock)
boldrini, spinicelli, ruggi, lumaca, was - 21:05 Thursday 24 September 2026 (69804) Print this report
ISC shift: CARM_NULL_1F

We obtained a reliable lock acquisition to reach CARM_NULL_1F with noticeable smoothness, but the locks achieved were nevertheless unstable and had an average life expectancy of a few minutes each.

We re-engaged COMMp, soft modes and diagonalization in the automation at CARM_NULL_1F.

The unlocks observed were different in nature and not easily explainable with loop instabilities. In particular, one of them was due to a glitch in the NI suspension that shot the F0 away by about a hundred microns (Fig.1).

We decided to decrease the CHRoCC voltage by another 10% before tomorrow's morning shift.

Images attached to this report