Reports 1-1 of 1 Clear search Modify search
AdV-PSL (Commissioning of SS)
mwas - 12:34 Friday 28 August 2026 (69666) Print this report
Comment to PSTAB 50Hz harmanics feed-forward preparation (69373)

This morning I have corrected the logic error at 10:16 UTC.

Figure 1. Shows the safety working properly, the FF corrections visible in INJ_PSTAB_NOISE and the FF tracking loop start at 10:17:30 UTC, 20 seconds after the RFC locks, despite the ENABLE flag being activated since at least 10:17 UTC.

Enabled also the 250Hz FF, and leaving it on for the day to see if any issues arises over several hours. I will disable the PSTAB FF loop at the end of the day as a precaution for the weekend.

Images attached to this comment
Search Help
×

Warning

Error

The present report has been modified outside this window. Please check for its integrity in the main page.

Refreshing this page will move this report into drafts.

×