AdV-PAY (NI and WI Payloads)Gherardini, Pinto - 10:33 Thursday 16 July 2026 (69369)
Print this reportComment to NI payload integration with the suerattenuator (69360)This morning, after the NI Payload intergration, we checked the electrical continuity and insulation towards the tower for the following cables: S1 and S2 (marionette coils); U1 (Ring Heater); U2 (Ring Heater motors); U3 (mirror coils for sensing and PT100 on marionette coil); V1 (mirror coils); V2 and V3 (marionette motors); Z2 (temperature probes on mirror coils and on ring heater).
The test was successful: no electrical discontinuities or short circuits towards the tower were found.