AdV-PAY (CP Support for NI and WI Monolithic Payloads)Gherardini, Zaza - 10:53 Tuesday 14 July 2026 (69348)
Print this reportComment to Payload assembly: WI payload full assembly, NI payload CP assembly (69343)This morning we checked the electrical continuity and insulation towards the metallic frame for the following cables: S1 and S2 (marionette coils); U1 (Ring Heater); U2 (Ring Heater motors); U3 (mirror coils for sensing and PT100 on marionette coil); V1 (mirror coils); V2 and V3 (marionette motors); Z2 (temperature probes on mirror coils and on ring heater).
We found one broken connection on the U2 cable: problem fixed.