AdV-SLC (Estimated cost/duration)mir - 18:02 Friday 26 June 2026 (69276)
Print this reportWI Instrumented Baffle debugAfter the replacement of the mid connector on 23/06/2026 we have been testing the system (starting on 25/6/2026) and the connection problem when launching the system has disappeared. We have been able to run the
"reset boards -> configure -> data read out for 30-60 seconds"
loop for several hours.
We will leave the baffles taking data over the week extending the read out period to few hours.
On Monday, we will provide a short list of tests we would like to run in collaboration with people at EGO to test the reliability of the connexions before proceeding to the installation of the BafTowers, payloads, etc.