During the NCal activities yesterday, the NE RH was accidentally switched off (see Fig. 1).
Benoit reported the presence of a loose cable in the RH electronics chain. Therefore, today Flavio inspected the system to investigate the issue and verify the cable connections.
Following the inspection, the RH was switched back on at 14:23 UTC with the voltage set to 16.6 V.